Home

Spa, Pool & Wellness Centre Construction

Swimming pools, Turkish hammams, saunas, steam rooms and full spa centres — turnkey with water technology and humidity control for hotels, villas and residences.

Spa, Pool & Wellness Centre Construction — Savaş Grup

Spa, Pool & Wellness

Savaş Grup A.Ş. builds swimming pools, Turkish hammams, saunas, steam rooms and complete spa centres on a turnkey basis for hotels, villas, residential complexes and thermal facilities. Water treatment and filtration, humidity-temperature control, waterproofing and hydrotherapy systems are installed by one team; a villa pool is delivered in 6–8 weeks and a hotel spa in 4–6 months.

The life of a pool or spa is decided by what you cannot see: waterproofing, filtration, humidity and temperature control. Savaş Grup A.Ş. builds swimming pools, Turkish hammams, saunas, steam rooms and spa centres for hotels, villas, estates and thermal facilities — from design to commissioning in one hand. A villa pool is delivered in 6–8 weeks, a hotel spa centre in 4–6 months.

Projects We Work On

  • Hotel and resort spas — indoor/outdoor pools, hammam, sauna, steam, treatment rooms, relaxation areas; integrated with our hotel construction projects.
  • Villa pools — infinity, overflow and skimmer pools; heated and indoor pools.
  • Estates and housing — shared pools, children's pools, fitness-spa blocks.
  • Thermal facilities — thermal water lines, mineral-water-resistant materials, cure units.
  • Sports complexes, health and rehabilitation — semi-Olympic pools, hydrotherapy and physiotherapy pools.

Scope: From Design to Commissioning

  • Concept design, 3D visualisation and user scenario (guest capacity, circulation)
  • Pool engineering: structure, hydraulics, overflow channel and balance tank, filtration and disinfection (chlorine, salt, UV, ozone)
  • Waterproofing: double-layer membrane / crystalline systems, testing and records
  • Hammam and steam room: dome, heated marble platform, basins; steam generator and humidity extraction
  • Sauna: timber selection, heater, ventilation
  • Humidity and temperature control: dehumidification units, heat pump, surface-condensation measures
  • MEP, lighting, sound; underfloor heating and anti-slip finishes
  • Finishes and interiors — with our interior architecture and decoration team
  • Testing, commissioning, operator training and handover

Pool Types: Which One Is Your Project?

TypeWhere it is preferredTechnical note
OverflowHotels, estates, villas wanting an infinity lookNeeds a balance tank and stronger filtration
SkimmerVillas and small poolsEconomical; water level 10–15 cm below the deck
Indoor / heatedHotel spas, year-round useDehumidification and condensation control are critical
Thermal / mineral waterThermal hotels, cure centresAcid-resistant finishes and pipework

The wellness trends leading in 2026 are compiled in spa, pool and wellness construction trends.

Process and Timeline

  1. Survey and brief (1 week) — ground, existing structure, usage scenario.
  2. Concept and engineering (2–4 weeks) — 3D, hydraulic and mechanical calculations, material list.
  3. Shell and waterproofing (3–6 weeks villa / 2–3 months hotel) — pool body, water test.
  4. Mechanical and finishes (2–4 weeks villa / 2–3 months hotel).
  5. Commissioning and handover — water balance, automation, operator training.

Hygiene, Safety and Energy

Automatic dosing and measurement, UV/ozone-assisted disinfection, anti-slip finishes, overflow-channel safety and accessible access are standard design inputs. Heat pumps, pool covers and heat-recovery dehumidification permanently lower running costs.

Why Savaş Grup?

  • One contract: construction, waterproofing, mechanical, filtration and interiors in one team; responsibility is never split.
  • Test records: waterproofing and pressure tests are documented.
  • Transparent quantity-based proposals and progress-based payments.
  • 27+ years, ISO 9001: pool and spa experience across hotel, villa and estate projects; on our residential construction projects the pool is planned from the outset.

Where We Work

Istanbul-based; we serve Aegean–Mediterranean coastal hotels, thermal regions and villa projects across Türkiye. Share your site dimensions and intended use and we will prepare a free survey and a quantity-based proposal.

Spa, Pool & Wellness

Spa, Pool & Wellness: areas of application

01

Hotel and Resort Projects

We construct large-scale pools and wellness centers in hotel spa and resort projects, delivering professional solutions for resorts, boutique hotels, and city hotels.

02

Villas and Private Residences

We design and build custom spa areas in villa pools and private residences, offering premium pool and spa solutions for luxury villas and condominiums.

03

Residential Complex Projects

We construct communal areas, social facilities, and wellness centers in residential complex pools, providing integrated solutions for residents’ comfort.

04

Sports Complexes

We build fitness centers, swimming pools, wellness areas, and sports facilities in sports complex construction, providing professional solutions for clubs and athletic centers.

05

Thermal Facilities

We provide specialized solutions for thermal facility construction including thermal hotels, healing centers, and health tourism facilities, with thermal water systems and custom infrastructure.

06

Health and Rehabilitation

We construct therapeutic pools, hydrotherapy areas, and health-focused spa facilities in medical spa construction and rehabilitation centers.

07

Why Savaş Grup A.Ş.?

✓27+ years of industry experience and references ✓ISO 9001 quality management system ✓On-time delivery guarantee ✓Single-source project management ✓24/7 technical support ✓Expert engineering team ✓Use of modern technology

In numbers

27+

Years of Experience

350+

Completed Projects

22

Countries Served

ISO 9001

Quality Management System

Spa, Pool & Wellness

How the Spa, Pool & Wellness process works

  1. 01

    Site Survey & Needs Analysis

    We inspect the site, then define your goals, budget and timeline together.

  2. 02

    Design & 3D Visualisation

    Architectural, structural and MEP designs are prepared and presented with photorealistic renders.

  3. 03

    Proposal & Contract

    A transparent bill-of-quantities proposal, a clear schedule and a payment plan are signed off.

  4. 04

    Construction & Site Management

    Works are executed under ISO 9001 quality protocols with weekly reporting and HSE audits.

  5. 05

    Handover & Support

    Turnkey handover after testing and commissioning; ongoing technical support after delivery.

Spa, Pool & Wellness

Spa, Pool & Wellness FAQs

01How does the process progress in spa and wellness projects?
The first step is a needs analysis and concept definition. Then, architectural and technical designs are prepared. During construction, insulation, plumbing, mechanical systems, and interior applications are executed. Finally, tests are performed, and the spa, pool, or wellness area is delivered fully functional.
02How are pool and spa construction costs calculated?
Costs depend on the size of the pool or spa area, materials used (ceramic, mosaic, natural stone, etc.), technical equipment (filtration, heating, ventilation), and special requests. Generally, calculations are done per m², but final pricing is determined after project design.
03What types of projects do you have experience with?
We have extensive experience in hotel and resort spa & wellness centers, villa and private residence pools, indoor and outdoor swimming pools, thermal facilities, hammams, saunas, and steam room projects. We provide solutions according to international standards for every project.
04How is hygiene and safety ensured?
All projects include water filtration and disinfection systems compliant with international hygiene standards. Non-slip flooring, automatic ventilation systems, and waterproofing solutions ensure long-lasting and safe use.
05What is the delivery time for spa and pool projects?
Small-scale pools and sauna projects take 2–3 months, medium-scale spa & wellness centers 4–6 months, and large hotel and thermal facilities 6–12 months. Duration may vary depending on project scope and special requests.
06Do you provide maintenance and post-handover support?
After delivery, all systems are tested and users are trained. We provide ongoing maintenance and technical service for long-term support.
Spa, Pool & Wellness

Articles on Spa, Pool & Wellness

Spa, Pool & Wellness

Get a quote for this service

Fill in the form for a free survey and a transparent, quantity-based proposal; we reply within 24 hours.