The life of a pool or spa is decided by what you cannot see: waterproofing, filtration, humidity and temperature control. Savaş Grup A.Ş. builds swimming pools, Turkish hammams, saunas, steam rooms and spa centres for hotels, villas, estates and thermal facilities — from design to commissioning in one hand. A villa pool is delivered in 6–8 weeks, a hotel spa centre in 4–6 months.
Projects We Work On
- Hotel and resort spas — indoor/outdoor pools, hammam, sauna, steam, treatment rooms, relaxation areas; integrated with our hotel construction projects.
- Villa pools — infinity, overflow and skimmer pools; heated and indoor pools.
- Estates and housing — shared pools, children's pools, fitness-spa blocks.
- Thermal facilities — thermal water lines, mineral-water-resistant materials, cure units.
- Sports complexes, health and rehabilitation — semi-Olympic pools, hydrotherapy and physiotherapy pools.
Scope: From Design to Commissioning
- Concept design, 3D visualisation and user scenario (guest capacity, circulation)
- Pool engineering: structure, hydraulics, overflow channel and balance tank, filtration and disinfection (chlorine, salt, UV, ozone)
- Waterproofing: double-layer membrane / crystalline systems, testing and records
- Hammam and steam room: dome, heated marble platform, basins; steam generator and humidity extraction
- Sauna: timber selection, heater, ventilation
- Humidity and temperature control: dehumidification units, heat pump, surface-condensation measures
- MEP, lighting, sound; underfloor heating and anti-slip finishes
- Finishes and interiors — with our interior architecture and decoration team
- Testing, commissioning, operator training and handover
Pool Types: Which One Is Your Project?
| Type | Where it is preferred | Technical note |
| Overflow | Hotels, estates, villas wanting an infinity look | Needs a balance tank and stronger filtration |
| Skimmer | Villas and small pools | Economical; water level 10–15 cm below the deck |
| Indoor / heated | Hotel spas, year-round use | Dehumidification and condensation control are critical |
| Thermal / mineral water | Thermal hotels, cure centres | Acid-resistant finishes and pipework |
Pool waterproofing, the plant room, humidity control in indoor pools and slip-resistant floors are covered in what investors should know about spa and pool construction.
Process and Timeline
- Survey and brief (1 week) — ground, existing structure, usage scenario.
- Concept and engineering (2–4 weeks) — 3D, hydraulic and mechanical calculations, material list.
- Shell and waterproofing (3–6 weeks villa / 2–3 months hotel) — pool body, water test.
- Mechanical and finishes (2–4 weeks villa / 2–3 months hotel).
- Commissioning and handover — water balance, automation, operator training.
Hygiene, Safety and Energy
Automatic dosing and measurement, UV/ozone-assisted disinfection, anti-slip finishes, overflow-channel safety and accessible access are standard design inputs. Heat pumps, pool covers and heat-recovery dehumidification permanently lower running costs.
Why Savaş Grup?
- One contract: construction, waterproofing, mechanical, filtration and interiors in one team; responsibility is never split.
- Test records: waterproofing and pressure tests are documented.
- Transparent quantity-based proposals and progress-based payments.
- 27+ years, ISO 9001: pool and spa experience across hotel, villa and estate projects; on our residential construction projects the pool is planned from the outset.
Where We Work
Istanbul-based; we serve Aegean–Mediterranean coastal hotels, thermal regions and villa projects across Türkiye. Share your site dimensions and intended use and we will prepare a free survey and a quantity-based proposal.