CONSTRUCTION COST

2025 Key-Ready Construction Cost Guide

If you are considering building a house or an apartment, the total cost of the project is one of the most important considerations. The total price of key-ready construction projects depends on many factors such as the price per square meter, the quality of materials, and labor. Therefore, it is vital to examine all expenditure items in detail and make a sound budget plan before starting the project to avoid unforeseen costs.

Cost per Square Meter and Influencing Factors

The cost per square meter is not fixed; it varies according to many factors. There can be significant differences between the cost of a villa in a rural area and an apartment in a large city. The quality of materials used, the quality of labor, the economic situation of the region, and the soil structure directly affect the price. Additionally, the project size and the type of labor chosen are other factors that determine the cost per square meter. Each project must be evaluated individually within its own conditions.

According to official 2025 data, the costs per square meter for residential construction range between 17,100 TL and 27,500 TL. These values vary depending on the building’s standards and floor height. For example, the cost for apartments with a maximum of three floors starts from 17,100 TL/m², while for luxury multi-story residences, it can go up to 27,500 TL/m².

Considering market conditions, key-ready project costs are in the range of 18,000 TL/m² to 35,000 TL/m². Due to inflation and fluctuations in the global supply chain, a slight increase in these prices has been observed in the second half of 2025. Furthermore, according to the 2025 Indicative Unit Costs of Buildings Circular, the cost per square meter of Class V (Group A) buildings can reach 34,400 TL. This category includes prestigious projects such as embassy buildings. These figures are calculated based on average quality materials. In the luxury segment, costs can increase by 20-30% if imported products are used.

Effect of Material Quality on Cost

The quality of the materials used has a direct effect on the cost. Local and standard materials are more affordable in terms of cost. In contrast, imported or high-end products can significantly increase the total expenditure. When selecting materials, criteria such as durability, aesthetic appearance, and thermal insulation should be considered.

Although cheap materials provide short-term savings, they can increase maintenance and repair costs in the long run.

In 2025, the cost per square meter for economy package projects is approximately 21,500 TL. For ultra-luxury configurations, the cost is around 29,500 TL. These packages include kitchen cabinets, ceramics, and decorative elements.

For example, using high-quality steel in reinforced concrete increases the cost by 15% and also significantly improves earthquake resistance. Due to the effect of inflation on material prices in 2025, the average price of a ton of iron has reached 10,000 TL, and the price of a cubic meter of concrete is approximately 1,500 TL.

Additionally, the use of sustainable materials such as recycled insulation panels provides environmental benefits and balances the total cost in the long run by saving energy. This approach has become a trend encouraged in 2025 for green building certifications.

Effect of Project Size on Cost

In larger-scale projects, the total cost increases, but the cost per square meter may be lower thanks to economies of scale. Large projects provide opportunities for bulk discounts on material purchases. On the other hand, additional infrastructure such as elevators, fire escapes, and common areas in multi-story buildings increases the cost. The duration of labor also increases in parallel with the project size.

For example, the key-ready cost of a 100 m² house might be around 2,200,000 TL (22,000 TL/m²). However, in a 500 m² villa project, this figure can drop to 19,800 TL/m² due to the advantage of bulk purchasing.

In contrast, adding common areas in a 10-story apartment building can push the cost up to 25,000 TL/m². Logistical challenges also increase with the project’s size. In large construction sites, the rental costs of cranes and heavy machinery can constitute 5-7% of the total budget. These factors can be modeled before the project using simulation software.

Effect of Ground and Earthquake Conditions on Cost

As Turkey is located in an earthquake zone, the characteristics of the soil play a very important role in cost calculation. Starting construction without a ground survey is a great risk, both in terms of security and finance. Loose or fill soils require foundation strengthening. On rocky soils, excavation operations increase the cost. According to earthquake regulations, the amounts of iron and concrete usage must be increased. In weak soils, special applications such as piled foundations may be necessary. This can increase the cost by 20-30%. With the updates in 2025, earthquake regulations have become even stricter.

Ground Survey

The ground survey carried out at the beginning of each project determines the type of foundation and the associated cost. Raft foundation or bored pile foundation methods can be applied on loose soils. Although these interventions increase the cost, they are essential for the long-term safety of the structure. The costs of a ground survey start from an average of 50,000 TL. They can reach up to 200,000 TL depending on the land size. However, this expense prevents much higher potential renovation costs.

Current Regulations

Current regulations increase costs by making the use of iron and concrete mandatory, especially in high-rise buildings. Failure to comply with the rules leads to legal sanctions and safety risks. The Regulation on Building Damage Assessment After a Disaster published in 2025 has standardized damage assessment processes and encourages preventive measures. Innovations such as seismic isolator technologies increase earthquake resistance but can raise the initial cost by 15-20%. Compliance with regulations is not just an obligation, but also offers an economic advantage by reducing insurance premiums.

How to Calculate Construction Costs?

When calculating construction costs, a master plan is first created and a quantity analysis is performed. The shell construction, finishing works, and additional works are examined separately.

  • In the shell construction phase, the cost of load-bearing elements such as foundations, columns, beams, and the roof is calculated.
  • In the finishing works phase, processes such as painting, ceramic tiling, installations, door, and window fitting are included.
  • Additional works include landscaping, parking, and common social areas.

This method provides a realistic projection of costs per square meter. In 2025, the shell construction cost per square meter is between 8,000 and 12,000 TL. When finishing and additional elements are added, the key-ready price reaches the 18,000-35,000 TL/m² range. For a detailed calculation, items such as site setup costs (~100,000 TL) and iron and concrete costs should also be added. To improve the calculation process, 3D simulations can be performed using software tools such as Building Information Modeling (BIM), which minimizes the margin of error.

Shell Construction

Includes expenses for foundations, columns, beams, and the roof. This phase forms the skeleton of the building and represents approximately 48% of the total cost. At 2025 prices, a ton of iron is about 10,000 TL, and a cubic meter of concrete is about 1,500 TL. Labor prices for formwork in shell construction vary by province. It can be 1,700 TL/m² in Istanbul, while it might be 1,400 TL/m² in Malatya.

Finishing Works

All details, from painting to ceramics, installations, doors, and window fittings, are calculated in this phase. The choice of quality materials increases the cost, while standard products protect the budget. This part constitutes approximately 44% of the total cost. For example, ceramic tiling can cost 500 TL/m², and electrical installations can cost 1,000 TL/m².

Additional Works

Landscaping, parking lots, social facilities, and elevator systems increase the property’s value, especially in apartment projects. These items should not be ignored. Additional works can constitute approximately 7% of the total cost. In 2025, an elevator installation starts from 500,000 TL and increases based on the building size.

Effect of the Number of Floors on Cost

The number of floors of the building has a significant effect on the base cost and additional expenses. In general, although base costs (columns, beams) decrease as the number of floors increases, the total cost rises due to elements such as elevators, stairs, installations, and additional security systems.

Number of FloorsEffect on the ProjectEffect on Cost
1-3 FloorsBasic and standard projectsLow cost
4-7 FloorsRequires an elevator and additional securityMedium cost
8+ FloorsFire systems, extra installations, complex structureHigh cost

This table summarizes the overall effect of the number of floors on the project.

Cost Estimation and Conclusion for the Year 2025

Key-ready construction costs for 2025 vary between 18,000 TL/m² and 35,000 TL/m², depending on the project details. It is important to remember that these figures are average values. The geographical location of the project, soil conditions, the complexity of the architectural design, and the quality of the selected materials significantly affect the final cost. For a successful project, a comprehensive budget plan that considers all these variables is essential.